Rebates and offers listings

Commercial and industrial heating system optimization rebates

Rebate frog

Varies

  • Customer
    • Gas customer
  • Business type
    • Commercial
    • Industrial
    • Multi-unit residential building
    • Agricultural
  • Project type
    • Existing building
    • New construction

Our rebates can help you lower the cost of optimizing the performance of your existing gas heating equipment, with rebates up to 75 per cent. These improvements can help you lower your energy use and operational costs.

The following heating optimization measures can help improve the efficiency of existing gas boilers and related equipment:

  • Economizer: A stack economizer helps to extract heat from flue gas for pre-heating of make-up water but also other fluids (e.g., domestic hot water).
  • Economizer condensing: Functions like an economizer but provides additional efficiency by lowering the flue gas temperature and causing water vapor in the exhaust to condense, which releases latent heat and can be harnessed to further the energy efficiency of the system.
  • Parallel positioning: Installation of parallel positioning system helps optimize combustion system efficiency. With parallel positioning, control valves for combustion air and natural gas fuel are positioned independently using individual actuators.
  • Oxygen control (combustion oxygen trim): oxygen sensors that measures the oxygen concentration in the flue gas and enables air supply adjustment based on real time measurements, ensuring optimal oxygen levels.
  • Total dissolved solids (TDS) control: Measurement of total substances (both organic and inorganic) in the water in the boiler to control the TDS levels as it can lead to scaling, corrosion, and reduced efficiency in boilers.
  • Energy/heat recovery ventilators (HRV/ERV): This measure installs heat exchangers between two air streams without mixing the two air streams to recover heat/and moisture.
  • Hydronic additives: Hydronic additives work by reducing water’s surface tension, which improves water’s ability to receive and deliver heat.
  • Ozone laundry systems: An ozone laundry system generates ozone, a naturally occurring molecule which helps clean fabrics by chemically reacting with soils in cold water. Adding an ozone laundry system can reduce the amount of chemicals, detergents, and hot water needed to wash linens.
  • Tune-ups: Tune-ups are maintenance procedures aimed at optimizing the efficiency and performance of a boiler. It will typically involve inspection, adjustment, testing and maintenance.

Boiler optimization measures

Item

Amount

Economizer non-condensing for small hot water boiler (retrofit only) or steam boiler up to 150 hp (up to 5000 MBH)

$10,000

Economizer condensing for small hot water boiler (retrofit only) or steam boiler up to 150 hp (up to 5000 MBH)

$13,000

Total dissolved solids blowdown control for small hot water boiler (retrofit only) or steam boiler up to 150 hp (up to 5000 MBH)

$4,000

Combustion oxygen trim for small hot water boiler (retrofit only) or steam boiler up to 150 hp (up to 5000 MBH)

$16,000

Parallel positioning for small hot water boiler (retrofit only) or steam boiler up to 150 hp (up to 5000 MBH)

$9,000

Economizer non-condensing for medium hot water boiler (retrofit only) or steam boiler 151-299 hp (>5000 MBH up to 10000 MBH)

$16,000

Economizer condensing for medium hot water boiler (retrofit only) or steam boiler 151-299 hp (>5000 MBH up to 10000 MBH)

$20,000

Total dissolved solids blowdown control for medium hot water boiler (retrofit only) or steam boiler 151-299 hp (>5000 MBH up to 10000 MBH)

$4,000

Combustion oxygen trim for medium hot water boiler (retrofit only) or steam boiler 151-299 hp (>5000 MBH up to 10000 MBH)

$18,000

Parallel positioning for medium hot water boiler (retrofit only) or steam boiler 151-299 hp (>5000 MBH up to 10000 MBH)

$10,000

Economizer non-condensing for large hot water boiler (retrofit only) or steam boiler 300 hp and up (>10000 MBH)

$21,000

Economizer condensing for large hot water boiler (retrofit only) or steam boiler 300 hp and up (>10000 MBH)

$25,000

Total dissolved solids blowdown control for large hot water boiler (retrofit only) or steam boiler 300 hp and up (>10000 MBH)

$4,000

Combustion oxygen trim for large hot water boiler (retrofit only) or steam boiler 300 hp and up (>10000 MBH)

$18,000

Parallel positioning for large hot water boiler (retrofit only) or steam boiler 300 hp and up (>10000 MBH)

$16,000

Parallel positioning plus combustion oxygen trim with controls for any size steam or hot water boiler (retrofit only)*

$49,000

*Retrofit-only combination offer not available for new boiler systems or new construction.

Energy and heat recovery ventilators 

Item

Amount

Details

Standalone or bolt-on heat recovery ventilator (HRV)/ energy recovery ventilator (ERV)
(65 per cent efficiency)

$3.30 per cubic feet per minute (CFM)

  • no existing recovery ventilator
  • system must have an existing integrated economizer

Standalone/bolt-on HRV/ERV
(75 per cent efficiency)

$3.70 per CFM

Standalone/bolt-on HRV/ERV
(85 per cent efficiency)

$4.10 per CFM

Integrated HRV/ERV
(65 per cent efficiency)

$2.10 per CFM

system must have an existing integrated economizer

Integrated HRV/ERV
(75 per cent efficiency)

$2.60 per CFM

Integrated HRV/ERV
(85 per cent efficiency)

$2.85 per CFM

Hydronic additives

Item

Amount

Hydronic additives

$300 per gallon

Ozone laundry

Item

Amount

Ozone laundry

$50 per pound of washing capacity, up to 75% of product cost

Tune-ups

Item

Amount

Process boiler tune-up

$0.75 per thousand British thermal units per hour (MBH), up to 75 per cent of project cost

Greenhouse boiler tune-up

$0.75 per MBH, up to 75 per cent of project cost

Space heating boiler tune-up

$0.75 per MBH, up to 75 per cent of project cost

Domestic hot water boiler tune-up

$0.75 per MBH, up to 75 per cent of project cost

Furnace and rooftop unit tune-up

100 per cent of project cost, up to $400


  1. You must be a FortisBC gas customer under any rate class except Rate 1.
  2. You must be a property owner or long-term leaseholder of an existing building or a builder/developer or property owner of a new construction project.
  3. Your hot water or steam boilers must be used to meet your site or facility’s loads, e.g. process load, sanitization or space heating. Boilers installed to meet other operational needs (e.g. backup, standby or secondary boilers) are not eligible.
  4. The hot water or steam boilers must use gas only.
  5. Retrofit-only combination offer not available for new boiler systems or new construction.
  6. Purchase date of products or services (as shown on the paid invoice) must be after December 19, 2024.
  7. You must submit an application and supporting documentation no later than 365 days after the purchase date of the product(s) or service(s) (as shown on the paid invoice).

Heating system optimization measures product eligibility 

  • Boilers must:
    • meet process load, sanitization or space heating needs
    • use gas only
    • not be installed for backup, standby or secondary use
  • Hydronic additives must:
  • Ozone laundry systems must:
    • transfer ozone into the water through venturi injection or bubble diffusion
    • connect to both hot- and cold-water inlets of the clothes washing machine(s) for laundromats
  • Heat recovery ventilators must:
    • be for systems with an existing integrated economizer
    • meet efficiency and integrated economizer requirements as listed in the table above
  • Tune-ups must:
  1. Contact a gas or mechanical contractor licensed with Technical Safety BC to service your boiler(s). Note: some products may be eligible for instant rebates at the point of sale. Visit our Trade Ally Network equipment supplier directory and look for this  Instant rebate icon.
  2. If the product(s) is not eligible for instant rebates, complete your heating system optimization rebate application within 365 days of the purchase date (as shown on the paid invoice). Be sure to provide copies of the fully paid invoice including make and model number of the eligible measures purchased and installed, or services provided.
  3. Once approved, you should receive your rebate within six to eight weeks.

Additional details

The application link takes you to Account login. Once you've registered and/or logged in you can start your application. Hint: we recommend using Google Chrome® for the best experience.

Rebate frog

Varies

Start your rebate application

For tips on using the online application, read our how-to-guide.

We're here to help

Our account managers and energy solutions managers are here to answer your questions and help you get rebates to lower the cost of optimizing your heating system.